Assembly Instructions - Franke AQUATIMER A3000 7612982131844 Notice De Montage Et De Mise En Service

Panneau de douche
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

11. Assembly Instructions

Warning!
Use the fitting only with non-return valves and the grit filters specified.
Failure to observe can result in an increased bacterial load in drinking water and cause
a health risk or even risk of death.
Warning!
• Operate the product only with safety extra low voltage (SELV). Do not earth the
components.
• The power supply (not included in the scope of delivery, see accessories,
Chapter
24) must be set up outside of the wet area, in a separate room.
• Secure the electric connection with an earth leakage circuit breaker (RCD).
Failure to observe can mean risk of death or material damage, e. g. from electric shock
or fire.
Important!
Before installing, flush the pipes in compliance with DIN 1988.
To protect the tiles, use masking tape when marking and drilling. Drill at low speed.
Depending on the composition of the wall, special wall dowels may have to be used (to
be provided by the customer).
The system line (not included in scope of delivery) for connecting the power supply to
the fittings must be installed in a conduit (to be supplied by customer) and looped
through.
Installing the Electric T-junction
Important!
The components of the electronic T-junction must be installed only when they are in a
dead condition.
Recommended system lines see
When using other cables for the system line, note the different colour coding. The outer
diameter must not exceed 7.5 mm.
Fig. A: Water connection from above
Fig. B: Water connection from rear
11.1 Only when the water connection is from the rear: Install the connection bracket (a)
leaktight.
11.2 Screw in the water volume regulators (b) leak-tight.
11.3 Align the water volume regulator in such a way that the screw plug and the operating
element are freely accessible.
11.4 For a shower head height of 2.10 m to 2.30 m, mark drill holes for installation at a
height (c) of 2.14 m to 2.34 m from the upper edge of the prefabricated foot base.
11.5 Drill according to the markings.
11.6 Insert the dowels.
11.7 Screw on the hook-in strip.
11.8 Hook-in the stainless steel housing.
Chapter
24., Accessories.
7

Publicité

Table des Matières
loading

Table des Matières