Installation Preparation - GE DCVH480EK Manuel D'utilisation Et D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

KIT CONTENTS (GE KIT #GE24STACK)
Bracket-
stack (R)
TOOLS YOU WILL NEED
Phillips screwdriver
Level

INSTALLATION PREPARATION

Remove the packaging.
Flatten the product carton to use as a pad to lay the
dryer down on its side. Continue using the carton to
protect the finished floor in front of
the installation location.
Installation Instructions
Screws (4)
Rubber
pads (4)
Bracket-
stack (L)
Gloves
29
INSTALLING THE STACK
BRACKET KIT
REMOVE THE DRYER LEVELING LEGS
1
A. Carefully lay the dryer on its side. Use the
packing material so you don't scratch the finish
on the dryer.
B. Remove the dryer leveling legs.
Unscrew and remove
all 4 leveling legs
INSTALL RUBBER PADS
2
TO DRYER BASE
A. Locate the 4 rubber pads in the parts package.
Insert rubber pads into the leveling leg holes.
B. Set the dryer upright.

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Dcvh485ekPcvh480ekPcvh485ek

Table des Matières