Packaging, Transport And Storage; Delivery; Transport; Storage - Xylem LOWARA Sekamatik 10 E7M Manuel D'installation, D'utilisation Et D'entretien

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

4. Packaging, Transport and Storage

4.1. Delivery

After receipt, the shipment must be checked for damage
and completeness immediately. In the event of any
deficiencies, the transport company and the manufacturer
must be informed on the day of receipt, as no claims can
otherwise be made or considered valid. Any damage must
be noted on the delivery or transport receipt.

4.2. Transport

Do not throw or tip the lifting unit during
transport.
Make sure that the lifting unit does not come into contact
with sharp edges. Protect the lifting unit from heavy blows.
The products are shipped in suitable packaging by the
manufacturer or supplier. This generally excludes damage
during transport and storage. Should you change locations
frequently, save the packaging carefully for re-use.

4.3. Storage

Newly delivered products are prepared for up to 1 year of
storage. If the product is being placed in interim storage, it
must be thoroughly cleaned before being stored!
The following must be observed for storage:
Place product securely on a fixed base and
secure against tipping over.
In addition, ensure that the equipment is
stored in dry areas.
Products
with
connections must have these tightly closed to
prevent contamination.
During extended storage the shaft must be
protected against moisture, sunlight, heat and
frost.
If you observe these regulations, your product can be
stored for a longer period of time. However, note that the
elastomer parts and coatings are subject to natural
embrittlement.

4.4. Returning to the supplier

Products that are returned to the factory must be clean and
correctly packaged. "Clean" means that the product has
been cleaned of contaminations and that it has been
contaminated in the event of use with mediums that are
hazardous to health. The packaging must protect the
product from damage. Please contact the manufacturer
before returning the product.

5. Installation and Start-Up

5.1 General

To avoid damage to the lifting unit during installation and
during operation, the following points must be observed:
The installation work must be performed by
qualified personnel in compliance with safety
regulations.
The lifting unit must be inspected for possible
damage prior to installation.
For level controls, pay attention to the
minimum water coverage.
Protect the pump from frost.
The power lines of the pump must be laid in
such a way, that a safe operation and easy
assembly/disassembly is ensured.
vacuum
and/or
pressure

5.2 Installation

It
is
up
consequential damages, for example by flooding of
rooms during disturbances at the pump, by means of
appropriate measures (e.g. installation of an alarm
system, a reserve pump or similar).
The lifting unit must be installed in a manner
that allows the lid to be opened. Ensure that there is
sufficient free space between the side inlets and
existing walls.
According to DIN EN 12050-3 (4.5.2 pipe
connections), drainage facilities which have drain trap,
the lowest point of which is over 180 mm from the
lower edge of the lifting system, must be connected to
the system by means of a suitable pipe loop (see
installation example).
Position the lifting unit horizontally on a flat floor. To ensure
quiet operation, a minimum distance of 5 mm between the
lifting unit and the house wall must be observed.
Installation examples
Sekamatik 10 E 7M
Sekamatik 10 E 8M
13
to
the
operator
to
prevent

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lowara sekamatik 10 e8m

Table des Matières