Handling And Transportation - Seko SPRING Manuel D'installation

Pompes doseuses a piston
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6. HANDLING AND TRANSPORTATION

6.1
Handling
The correct way to handle the pump is shown on the drawing here below.
If the pump is assembled on a baseplate with lifting lugs use them for handling.
 in any case note the following instructions:
 do not sling, pull, push the pumphead nozzles or flanges
 do not sling, pull, push the adjustment knob
 do not sling, pull, push the plunger
 when lifting loads pay attention to the following
 dress helmet, accident protective shoes and gloves
 do not stand under hanging loads
 do not hand lift overload
when hand lifting load do not assume position that can be dangerous for the spinal column and dorsal mus-
cles
SPR0136001
Rev. 2.4
EN
9

Publicité

Table des Matières
loading

Table des Matières