Fire Hazard - Hatco HWB Série Manuel D'installation Et D'utilisation

Puits chauffants intégrés
Masquer les pouces Voir aussi pour HWB Série:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION
Installing Top Mount Unit into Combustible
Countertop
WARNING

FIRE HAZARD:

• Hatco mounting flange kits must be used when
mounting unit in a combustible countertop.
• Unit must be installed using ribbon putty gasket
between the unit and the installation surface per
installation instructions.
NOTE: Cut the opening for both the mounting flange/unit and
the control enclosure before placing the assembly into
the countertop opening.
NOTE: Make sure the installation location provides enough
room for the remote control enclosure, electrical
connections, and plumbing connections.
1. Cut the appropriate opening for the mounting flange into
the countertop. Refer to "Combustible Countertop Cutout
Chart (for Unit/Mounting Kit)" in this section.
2. Cut the appropriate opening for the control enclosure.
Refer to "Control Enclosure Cutout Dimensions" in this
section.
3. Place ribbon putty gasket around the cutout edge of the
countertop. Make sure the ribbon putty gasket overhangs
the cutout edge or seal the unit with silicone adhesive.
NOTE: A roll of ribbon putty gasket material is supplied with the
unit.
Mounting Flange
Ribbon Putty Gasket
Combustible
Countertop
Cutout edge of combustible
counter top.
Installing Ribbon Putty Gasket
4. Place the mounting flange into the countertop opening.
5. Secure the mounting flange tabs to the edge or the
underside of the combustible countertop using the
appropriate hardware (mounting hardware not supplied).
NOTE: For underside mounting, tabs on mounting flange must
be bent to the underside of the countertop.
Mounting Flange
Flange Tab
Mounting
Hardware
(not supplied)
6. Place ribbon putty gasket around the inside edge of
the mounting flange. Make sure the ribbon putty gasket
overhangs the edge of the flange or seal the unit with
silicone adhesive.
7. Place the unit into the mounting flange opening.
8. Using a screwdriver, rotate the unit's EZ locking tab
outward to secure the unit to the underside of the mounting
flange. Rotate as many tabs as needed to secure the unit
to the mounting flange.
Inside
edge
Mounting
of flange.
Flange
9. Carefully trim and remove the excess ribbon putty gasket
material from around the unit.
16
Mounting
Installation of Mounting Flange Kit
Combustible
Countertop
EZ Locking Tabs
English
Countertop
Edge
Mounting
Countertop
Underside
Mounting
EZ Locking
Tab
Form No. HWBM-0518

Publicité

Chapitres

Table des Matières
loading

Table des Matières