Watts BT-M6Z02-RF 230V Guide Utilisateur page 8

Masquer les pouces Voir aussi pour BT-M6Z02-RF 230V:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

6.A.2
Centralyzed Installation
In this configuration, one BT-M6Z02-RF - called "Main" BT-M6Z02-RF - will centralize the information of the other
BT-M6Z02-RF – called "Sub" BT-M6Z02-RF.
Its role is
-
to propagate Heat and Cool signal to the system
-
to handle the boiler / global pump for the whole system.
If there is a BT-HCM02-RF in the installation, it MUST be linked to "Main" BT-M6Z02-RF.
BT-WR02 RF
( OPTIONAL )
Element 1 to link
Do the RF Link procedure as in Standalone version then proceed with the RF link of all BT-M6Z02-RF
« Main » BT-M6Z02-RF
BT-M6Z02 RF
Press < for 5 seconds, all channel leds
must blink Green. Product is waiting for
link.
Note: To exit, press < for 5 seconds.
Exemple of a "Centralyzed Installation"
BT-D02 RF
BT-A02 RF
BT-M6Z02 RF
( Main BT-M6Z02-RF )
BT-HCM 02 RF
( OPTIONAL )
( OPTIONAL )
Element 2 to link
« Sub » BT-M6Z02-RF
Press > for 5 seconds, all
channel leds must blink Red.
Product is waiting for link.
Note: To exit, press > for 5
seconds.
BT-S6Z02 RF
( OPTIONAL )
BT-D02 RF
BT-WR02 RF
When link is done, the two BT-
M6Z02-RF return to normal mode.
BT-M6Z02 RF
8
BT-M6Z02 RF
BT-M6Z02 RF
BT-M6Z02 RF
( MAX 3 Sub BT-M6Z02-RF )
RF Links to do
Comments

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bt-m6z02-rf 24vBt-m6z02-rf

Table des Matières