Installation Bushing; Antenna / Antenna Cable; Telescopic Mast - Girsberger ATC Manuel D'utilisation

Avalanche training center
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

8. Installation
8.1 Bushing
The bushing for the mast must be underground, mantled by concrete if possible.

8.2 Antenna / Antenna Cable

Connect the antenna cable to the antenna and pull the rubber grommet completely over the connector.
Insert the cable from above into the mast and down to the hole in the lower mast section. Use the
mounting devices to fix the antenna at the upper end of the telescopic mast. Watch for good electrical
connection.

8.3 Telescopic Mast

Loosen the screws on the brackets and extend the two upper sections for the desired height (100 cm
each maximum). Fasten the screws with a maximum torque of 40 Nm. Insert the telescopic mast into
the bushing.
8.4 Information Board
Use the material provided for fixing the information board on the lower section of the telescopic mast.
45

Publicité

Table des Matières
loading

Table des Matières