System Setup; Control Unit - Girsberger ATC Manuel D'utilisation

Avalanche training center
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

7. System Setup

7.1 Control Unit

In order to avoid damage from humidity or water, the system must be set up indoors!
1. Insert 6 Alkaline Batteries 1,5 V Type IEC LR20 (size D).
Note:
Only use new batteries that come in the original package. All of them must be of the
same brand, same type, same production lot and end of use date. Watch for proper
polarity and for clean contacts.
2. Set the ON / OFF sliding switch to ON.
3. Close the control unit.
4. It is now ready for use.
42
ON / OFF

Publicité

Table des Matières
loading

Table des Matières