Checking For Gas Leaks; Prior To Use - Campingaz 2 Classic L Série Mode D'emploi

Masquer les pouces Voir aussi pour 2 Classic L Série:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 5
2) To use the equipment with the flexible hose XP D
36-112, G 1/2 and M 20x1.5 nuts: (solution d) b))
- loosen and remove the NF ringed tailpiece to release
the G 1/2 inlet connector.
- remove the seal
- tighten the G1/2 threaded nut on the hose onto the
barbecue inlet connector and the M20x1.5 threaded
nut onto the regulator output connector following the
instructions supplied with the flexible hose.
- use a spanner to hold the barbecue inlet connector firm
and tighten or loosen the threaded nut with another
spanner.
- use a spanner (14) to hold the regulator outlet connector
firm.
14
- check for leaks following the instructions in paragraph f).
Check that the flexible hose stretches out normally
without twisting or pulling and does not come into contact
with the hot sides of the barbecue. it should be replaced
when the expiry date on the hose is passed or whenever
it is damaged or develops surface cracks.
Belgium, Luxembourg, United Kingdom, Ireland,
Portugal, Spain, Italy, Croatia, Greece, Netherlands,
Czech Republic, Slovakia, Hungary,
Norway, Sweden, Denmark, Finland, Bulgaria, Turkey,
Romania, Poland:
The barbecue is equipped with a circular connector. it
should be used with flexible hose that is suitable for use
with butane and propane gas. Hose length should not
exceed 1.20 meters. it should be replaced if it is damaged
or cracked, when required by national regulations or at the
end of the part lifecycle. Do not pull or pierce the hose.
Keep the hose away from any parts of the barbecue
that get hot. Check that the flexible hose stretches out
normally, without twisting or pulling.
Switzerland, Germany, Austria:
The barbecue should be used with flexible tubing that
is suitable for use with butane and propane gas. Tubing
length should not exceed 1.50 meters. Do not pull or
pierce the tubing. it should be replaced if it is damaged
or cracked, when required by national regulations or at
the end of the part lifecycle. Do not pull or pierce the
tubing. Keep away from any parts of the barbecue that get
hot. Check that the flexible hose stretches out normally,
without twisting or pulling.
Flexible tubing connection: To connect the tubing to the
connector on the barbecue, tighten the nut on the tubing
firmly
but without excess force using the two wrenches provided:
- no. 10 wrench to tighten the connector
- no. 17 wrench to tighten the nut on the tubing
10
- check for leaks following the instructions in paragraph f).
Slovenia,
17
e) Lid
Handle the lid carefully, especially during operation. do
not lean over the base
f) Checking for gas leaks
1) Work outside, away from all sources of ignition. do not
smoke.
2) Make sure the control knobs are in the "off" (O) position.
3) Push the end of the hose completely onto the regulator
nozzle and secure with a suitable clip.
4) Fit the regulator onto the gas cylinder in accordance
with its instructions.
5) Use a gas leak solution to test for leaks. Important:
never use a naked flame to check for gas leaks.
6) apply the solution to the connections cylinder/regulator/
hose/apparatus (the control knobs should remain
closed: off position O). open the gas cylinder valve.
7) Bubbles in the gas leak solution indicate that there are
gas leaks.
8) The leak can be stopped by tightening any hose
connection or replacing any faulty component. the
barbecue must not be used until the leak is stopped.
9) Close the valve on the gas cylinder. Check for leaks at
least once per year and each time the gas cylinder is
replaced.
g) Prior to use
Never use the barbecue until the instructions have been
read carefully and understood. also, make certain that:
- there are no leaks
- the venturi tubes are not blocked
- the
hose
does
not
touch
any
components
which
may get hot.
- that the ventilation
openings in the gas
receptacle housing
are not obstructed, if
appropriate.
Check that the venturi tubes (VT) cover the
injectors (IJ).
11
GB

Publicité

Table des Matières
loading

Table des Matières