Installation; Before Installation; Mounting The Charger - Dometic Psb12-40 Instructions De Montage

Table des Matières
Les langues disponibles

Les langues disponibles

  • FRANÇAIS, page 49
EN   PSB12-40-24-12-80
re-enters the I phase and charges the battery. The U2 phase is limited to between 24 and 48 h depending on the
battery type.

9 Installation

Before installation

Observe the following instructions when selecting an installation location:
• Ensure that the mounting surface is solid and level.
• Choose an well ventilated installation location to avoid overheating.
• Observe a distance of 10 cm to the ventilation openings of the cooling fan.
Choose a suitable installation location to connect the power cables to the battery.

Mounting the charger

NOTICE! Damage hazard
Before drilling any holes, ensure that no electrical cables or other parts of the vehicle can be damaged by
drilling, sawing and filing.
1. Ensure that the vehicle's engine and the battery chargers are switched off.
2. Set the switch to the
3. Screw the charger to the mounting surface.
Determining the cable cross-section
The cable cross-section of the power cables depends on the model and on the cable length.
12
OFF
position.
1.
3.
2.
Table des Matières

Dépannage

loading

Ce manuel est également adapté pour:

Psb12-80Psb24-40Psb24-60Psb12/24-20Psb12/24-40Psb24/12-40 ... Afficher tout

Table des Matières