Device Use; Cleaning And Maintenance - Royal Catering RCBD-5L Manuel D'utilisation

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 12
1. Handle and drainer
Align the slot and slide the handle over the pin.
Attach drip tray.
2. Attaching a standard keg
D
B
A
C
Ensure that the trigger button [4] is in the off
position and there are no objects inside.
Punch the safety seal on the upper part of the keg
using the CO
cartridge shield with pin [12].
2
Press the pin all the way to the end [A]. The snap
sound means correct connection to the barrel.
Press the lid opening button [9]. Place the keg inside
the device [B].
Connect the mechanism (the CO
gas pipe [C] and
2
the beer dispensing tube [D]) to the dispenser.
ATTENTION! Make sure all hoses are connected
correctly and the CO
pressure adjustment knob is
2
in the off position [-].
3. Installing a CO
cartridge
2
E
90º
F
Turn off the device using the switch [8].
Press the lid opening button [9]. Open the device
cover [1].
Pull aside the CO
cartridge shield (max. 90°).
2
Unscrew the CO
cartridge shield (anti-clockwise)
2
and lift it [E].
Place a gas cartridge inside the shield [F].
Close the gas shield and lower it to the starting
position.
Close the lid and turn on the device with the switch
[8].
10
4. Installation a Heineken keg:
ATTENTION! Heineken kegs do not require a CO
2
cartridge. Remove the gas cartridge (if present) before
installing this keg.
I
G
H
Before installing a Heineken type keg, remove the
green plastic connector from the top of the keg
using a flat screwdriver [G].
Connect the new Heineken type adapter with the
dispenser hose, included in the kit [H].
Place the new Heineken adapter with the hose in the
upper part of the keg [I].
Insert the Heineken type keg into the device, then
connect the keg to the dispenser.
5. Replacing a keg
Set the faucet lever [2] in the vertical position.
Set the CO
pressure adjustment knob to the [-]
2
position [RCBD-5L].
Open the lid, pull the handle to release the gas
remaining in the barrel, disconnect the hose from
the adapter and remove the barrel from the device.
Pull out the needle from the barrel.
Install the new keg (follow the keg assembly
instructions).
6. Replacing a used gas cartridge
Proceed analogously to a gas cartridge installation.
ATTENTION! Use cartridges with the following parameters:
B
A
Net weight [g]
15,5-16,5
Gross weight [g]
57-58,6
Cartridge weight [g]
42-42,6
Volume [ml]
20
A
8,6-8,9
B
88-89
C
21,7-22
Pressure [kgf/cm
]
60
2
Explosion pressure [bar]
450
Rev. 19.03.2019
7. Changing water in the cooling chamber
gas
It is recommended to change the water in the cooling
system at least once a week.
Place the device above the sink.
Open the valve with the trigger button [4]. Wait for
the water to drain out of the system.
Close the valve with the trigger button [4].
Pour 800 ml of fresh water into the appliance.
Repeat if necessary.
8. Cleaning the dispenser
Before the first use, then at least once a week, it is
necessary to clean the dispenser.
Fill the cleaning pump, supplied with the kit, with
warm, clean water.
Connect the cleaning pump to the dosing unit [J].
Open the dispenser valve. Feed water using a pump.
Repeat if necessary.
9. Replacing the connector and gasket of the CO
Remove the empty CO
Remove the gasket and connector from the CO
cartridge seat [K].
NOTE: Be especially careful not to damage other
parts of the device.
Place a new CO
connector in the CO
2
[L].
Place the gasket in the CO
Press the replaced elements with an empty CO
C
cartridge [N].
WARNING! Using a full CO
of explosion!
10. Replacing the beer discharge hose:
Open device lid and gently prize off the hose
housing. Then set the tap to the beer flow position
and gently pull the house until it is removed
completely. Releasethe tap.
Remove hose housing. Remove the clamp from the
hose and remove the plastic nozzle from it.
Rev. 19.03.2019
Attach hose housing, insert plastic nozzle into the
new hose and put on clamp.
Set the tap in the beer flow position and insert the
other end of the hose into the tap as far as it will go,
release the tap.
11. Replacing needle seals
J
When a leak around the needle is discovered, replace its
seal. In order to do that remove the seal with the handle
from the device, unscrew the needle from the handle
(anticlockwise), remove the old seal, attach the new seal
and screw the needle to the handle (clockwise).

3.3. DEVICE USE

After correctly installing the keg and connecting the device
cartridge.
to the power source, it is possible to begin work. To start
2
the device, put the switch in the „ON" position.
L
M
A.
Setting the cooling temperature
By means of the [+] and [-] buttons located next to
K
the temperature display, the user can change the
cooling temperature of the keg in the range of 2°C -
12°C (36°F - 54°F).
B.
Changing the temperature unit (RCBD-5LB)
N
Press and hold the [+] key to change between
degrees Celsius and Fahrenheit.
cartridge.
2
2
C.
Working with the dispenser
To pour beer into a waiting vessel, lower the faucet
lever. The beer will start to escape through the
cartridge seat
nozzle.
2
To prevent excessive foaming, bring the nozzle
cartridge seat [M].
closer to the wall of the vessel and hold it at an angle
2
so that beer does not drop into the vessel from
2
a height.
cartridge creates a risk
NOTE: Do not dip the nozzle tip in beer. This can
2
cause excessive foaming.
After pouring the beer, set the lever in the starting
position.
NOTE: It is recommended to cool and rinse the vessel
before pouring beer to avoid excessive foaming.
NOTE: Insufficiently chilled beer can foam up high.
It is recommended to store the keg in a cool place
before installing it in the device.
NOTE: Increased amount of foam produced when
pouring the first portion of beer is normal.
NOTE: The last portion of beer can be forced out of
the keg at more than usual pressure.

3.4. CLEANING AND MAINTENANCE

a)
Unplug the mains plug and allow the device to cool
completely before each cleaning, adjustment or
replacement of accessories, or if the device is not
being used.
11

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rcbd-5lb

Table des Matières