Installation and Operating Instructions
CHAPITRE 8
Please fill in the commissioning report.
-
The example shall remain in this document. Any questions relating to the warranty can only be addressed upon presentation of the commissio-
ning report!
Installing company:
Location/Company headquarters: ....................................................................................................................................................
Tel� / Email:
Model/Type:
Complete serial number:
(cf. type plate on fan)
Date of installation:
1� Inspection carried out in accordance with
DIN EN 60079-17:
2� Electrical connection/installation to VDE?:
3� Minimum air gap checked?:
4� Unhindered running of impeller checked?:
5� Current consumption measured (cf� type plate)?:
6� Airflow direction and direction of rotation checked?:
7� Vibration limits checked?:
8� Potential equalisation available:
m
The electrical system corresponds to the recognised rules of electrical engineering and the Ex guidelines!
The technical documents were submitted to the operator� He became acquainted with the safety information, operation
and maintenance of the fans using the present installation and operating instructions!
__________________________________
Place, Date, Signature
MegaBox MB – Centrifugal fans
....................................................................................................................................................
....................................................................................................................................................
....................................................................................................................................................
....................................................................................................................................................
....................................................................................................................................................
YES
n
YES
n
YES
n
YES
n
YES
n
YES
n
YES
n
YES
n
___________________________________
Place, Date, Signature
Client/Owner
Controller: ..........................................................................
Value: ..........................................................................
Value: ..........................................................................
Value: ..........................................................................
11
8�1 Commissioning report
according to DIN EN 60079-17
EN