GB
MT
Charging the battery
1. Remove the battery (11) from the
device.
2. Push the battery (11) into the charging
slot of the battery charger (21).
3. Connect the battery charger (21) to a
power outlet.
4. After charging, disconnect the battery
charger (21) from the mains.
5. Pull the battery (11) out of the battery
charger (21).
Control LEDs on the charger (21):
green
red
lights up
—
—
lights up
—
flashes
flashes
flashes
Operation
Inserting and removing the
battery
WARNING! Risk of injury due to
unintentional start-up. Only insert the re-
Operating mode Symbol
Impact drilling
Drilling
Screw
32
Meaning
• Battery is fully
charged
• stand-by (No
battery inserted)
Battery is charging
Battery is over-
heated
Battery is defective
chargeable battery into the device once
the device is fully prepared for use.
NOTICE! Risk of damage! An incorrect
battery can damage the device and bat-
tery.
Inserting the battery
1. Push the battery (11) along the guide
into the battery holder (10).
You will hear the battery click into
place.
Removing the battery
1. Press and hold the battery release (12)
on the battery (11).
2. Pull the battery out of the battery hold-
er (10).
Selecting the operating
mode
Notes
• Use clamps or another practical
way to secure and support the
workpiece to a stable platform.
Holding the workpiece by your hand or
against the body leaves it unstable and
may lead to loss of control.
• Only operate the function selector
switch when the tool has stopped.
Procedure
Set the function selector switch (5) so that
the arrow mark points to the desired sym-
bol.
Material
Concrete, Stone
wood, metal, plastic ⭮
Screwing in and un-
screwing
Direction of rota-
tion
⭮
Screwing in: ⭮
Unscrewing: ⭯