Saey Scope Guide D'installation Et D'utilisation page 56

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Removing the inspection cover
Once per heating season (preferably at the end of the season), the inspection cover must be removed
from the appliance in order to remove the ash powder from the backflow preventor. The inspection
cover must also be removed if you decide to use the top outlet instead of the one on the rear of the
appliance (see: changing the fume outlet duct). To do this, grip the cover in the centre of the rib and tilt
it upwards to lift it from its supports. Now you can also remove any ash powder deposited on the rear of
the appliance with a vacuum cleaner.
Changing the fume outlet duct
If necessary, the fume outlet duct connection (factory setting: on rear), can also be altered to be
situated at the top. A separate connector pipe (special attachment) is required for this. First remove the
inspection cover from the appliance (as described above). Then lift out the sunken cover in the cover
plate and remove it through the opening of the inspection cover. Now insert the connector pipe through
this opening and reattach it to the same anchor point. Finally, insert the sunken cover through this
opening and reattach it to the rear from the inside, and replace the inspection cover.
Assembly of the combustion air connector pipe
If necessary, an additional connector pipe for the combustion air (special attachment) can be attached
to the rear of the multifuelstove, so that the combustion air will not be supplied centrally. To do this, the
radiation plate must first be loosened from its 4 anchor points. In addition, the cotter pin must be
removed from the air inlet shaft at the bottom, so that the shaft and the handle can be dismantled. Once
these sections have been removed, the combustion air connector pipe and the seal can be screwed
down on the rear. Now you should manually slide the air inlet completely to the right (rear view/position
"0"), and attach the handle again; set it to position "0" (left rib lining). Finally, rotate the shaft through the
side opening of the combustion air connector pipe until the short corner fits into the bottom opening of
56

Publicité

Table des Matières
loading

Table des Matières