Télécharger Imprimer la page

Kohler K-1697 Guide D'installation page 7

Masquer les pouces Voir aussi pour K-1697:

Publicité

Les langues disponibles

Les langues disponibles

Install the Electrical Supplies (cont.)
Electrical Rating
Water Supply
Water Supply Shut-Off Valve
Steam Line
Pressure Relief Valve (supplied)
Sizing The Steam Room
DANGER: Risk of electrocution. Disconnect the electricity to the working area at the main breaker
panel before performing these installation steps.
Follow all local electrical codes. All electrical work should be done by a qualified electrician.
Review the illustration showing specific Steam Generator Installation Requirements for your Steam
Generators.
Install the appropriate electrical supplies.
Kohler Co.
240 V, 59 A, 50/60 Hz
3/8" copper line
3/8" NPT female
1/2" copper line (1/2" NPT
thread)
3/4" NPT female thread
894 cu ft (25 cu m)
7
240 V, 68 A, 50/60 Hz
3/8" copper line
3/8" NPT female
1/2" copper line (1/2" NPT
thread)
3/4" NPT female thread
1000 cu ft (28 cu m)
1053777-2-D

Publicité

loading

Ce manuel est également adapté pour:

K-1716