Installation; Starting The Machine - Gaggia PLATINUM VISION Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

STARTING THE MACHINE

Make sure that the main power button is not pressed in the "ON" position.
1
Remove the coffee bean hopper
cover.
Fill the hopper with coffee beans.
4
Fill the tank with fresh drinking
water. Do not exceed the "max"
level indicated on the water tank.
Once fi lled place the tank back into
the machine.
7
Press the main power button to the
"ON" position.
2
Close the cover pushing it down
completely.
5
Attach the female end of the power
cord to the machine. Insert the
male end into the power outlet
(see data tag).
When the right temperature is reached, the machine performs a priming and
a rinse cycle of the internal circuits. A small quantity of water is dispensed.
Wait for this cycle to be completed automatically.
See page 21 to enable/disable the rinse function.
The screen for beverage dispensing appears on the display; see page 8.
TO ASSESS WATER HARDNESS, SEE "WATER
HARDNESS MENU" ON PAGE 22.

INSTALLATION

3
Remove the water tank. We
recommend installing the "Aqua
Prima" water fi lter (see page 7).
6
Place a container beneath the hot
water spout.
5

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Sup 034ar

Table des Matières