Télécharger Imprimer la page

OVE LEA 60 Manuel D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

1. Level the track (B) and mark the track holes' positions.
2. Remove the track and drill pilot holes in the marked locations with a Φ8mm (5/16in) drill bit.
3. Insert the wall anchors (II) using a rubber mallet until the wall anchors are flush with the wall.
4. Replace and secure the track (B) with screws (CC). Do not overtighten.
Helpful Hint
Make sure there
is a support stud
located behind the
drywall, behind the
tracks!
Base edge
WALL TRACK INSTALLATION
Helpful Hint
Do not overtighten!
This may crack the
acrylic or tile walls.
9
1
B
2
Φ 8mm
5/16in
3
II
4
CC

Publicité

loading

Ce manuel est également adapté pour:

Lea-gp600665834