Télécharger Imprimer la page

LEGRAND Green'up One Manuel D'installation page 30

Publicité

Les langues disponibles

Les langues disponibles

The installation of two 3-phase charging stations to the pedestal
Tightening torque: 10 Nm
5 mm
Put PE and N connections on the
same side as the pre-installed
ground conductor.
Put L1, L2 and L3 connections on
the other side of the installation
compartment.
Supply
Max uppstream 63A
Max wire dimension 16 mm²
30 / 52
Chaining
LERAK136-FRENIT/20230502
Charger 1
Wire dimension:
16A version 2.5 mm²
32A version 6 mm²
Charger 2

Publicité

loading

Ce manuel est également adapté pour:

0 570 18