Télécharger Imprimer la page

LEGRAND Green'up One Manuel D'installation page 25

Publicité

Les langues disponibles

Les langues disponibles

Prepare the charger for mounting
Remove the included cable gland from the bottom and close
1
the cable entry with a cover plug (included).
4
Assemble the base and installation box.
5
Assemble the installation box cover after the installation work is completed.
Mounting Kit for EV Charging Station
Open the cable entry M32 for supply / connection
2
cable with a step drill bit.
Open also the cable entry M16 for an additional
electrical cable, if necessary.
M32
Install the included grommet to the
3
M32 opening.
Install a grommet to the M16 opening,
if necessary.
LERAK136-FRENIT/20230502
M16
M16 is not in use when
mounting the charging
station to the pedestal.
25 / 52

Publicité

loading

Ce manuel est également adapté pour:

0 570 18