6.2. Wiring example
The installation of two 1-phase charging stations to the pedestal
Tightening torque: 10 Nm
5 mm
Put PE and N connections on the
same side as the pre-installed
ground conductor.
Put L1, L2 and L3 connections on
the other side of the installation
compartment. You can also leave
the ending L3 connection under
the top cover.
Supply
Max uppstream 63A
Max wire dimension 16 mm²
Mounting Kit for EV Charging Station
Chaining
LERAK136-FRENIT/20230502
Charger 1
Charger 2
Wire dimension:
16A version 2.5 mm²
32A version 6 mm²
29 / 52