Télécharger Imprimer la page

LEGRAND Green'up One Manuel D'installation page 23

Publicité

Les langues disponibles

Les langues disponibles

5. Mounting instructions
5.1. Before installation
Remove the pedestal from its package. Do not scratch the surface of the item after removal from the package.
When selecting installation site, take into account the following:
You need accessories applicable for the mounting site and method.
The charging station is applicable for indoor and outdoor use.
To make sure the optimal charging performance, the charging station should not be exposed to direct
sunlight.
The minimum space necessary for operating and maintenance.
min. 200 mm
Mounting Kit for EV Charging Station
Obey always national regula-
tions and site requirements
LERAK136-FRENIT/20230502
min. 200 mm
23 / 52

Publicité

loading

Ce manuel est également adapté pour:

0 570 18