Télécharger Imprimer la page

Xylem FLOJET 4305 Guide D'installation page 3

Pompe de lavage

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 4
Mounting:
Horizontal
Mounting
Installation:
1: Remove shipping plugs
from the pump ports.
2: Connect hose to
(A) and strainer (B). Use
3/4" (19 mm) braided
reinforced hose and a
worm clamp for hose
provided. Do not over tighten screws to allow
grommets to absorb vibration.
4: Insert Pumpgard
the pump body.
WARNING – SAFETY PRECAUTION
Electrical:
Failure to follow the procedures below will void the
product warranty and/or cause possible harm to
persons or pump. In accordance with ABYC E-11,
AC and DC Electrical Systems on Boats guidelines.
Please reference Illustration A on fold out panel for
wiring instructions.
Operation:
1: Open seacock.
2: Open hose bib and/or pressure nozzle.
3: Turn on pump.
4: Close pressure nozzle/hose bib when water
runs free of air. Pump is now ready for automatic
demand operation.
5: For prolonged operation, pump must operate at
NOTE: Do not operate longer than 15 min.
continuously!
Vertical
Mounting
strainer into pump intake port
TM
This is a high pressure pump. Prior
to activation, ensure that the hose
clamps, discharge hose and snap
be properly anchored to a solid
surface.
Do Not
Submerge in
Bilge Water
C
A
B

Publicité

loading

Ce manuel est également adapté pour:

Flojet 4325