Télécharger Imprimer la page

Kohler Components K-77990-8-CP Guide D'installation Et D'entretien page 7

Publicité

Les langues disponibles

Les langues disponibles

Tee
Tee Inlet
Valve Outlet
4. Install the Tubing
Attach the tee to the spout tube.
Measure the distance between the tee inlets and each valve body
outlet.
Cut the copper tubing to fit.
Pivot the valve bodies, and install the two pieces of copper
tubing.
Confirm that the copper tubing has been cut to the correct length.
Kohler Co.
7
1317801-2-A

Publicité

loading

Ce manuel est également adapté pour:

Components k-77990-4-cpComponents k-77990-9-cp