Télécharger Imprimer la page

RDI ELEVATION RAIL Instructions D'installation page 8

Publicité

Les langues disponibles

Les langues disponibles

2.
Identify stair cable guide A. This guide will be inserted
first in the upper (top) stair post. Slide cable guide A
assembly into the post. The bracket should be at the top
and the bottom of the guide should bottom out on the
post base. The cable will slide down the post through
the open slot in the side of the post. Make sure the
excess cable exits out of the top of the post (Fig. 24).
3.
a. Holding cable guide B use a back and forth motion
to stretch the cable and work guide B towards your
lower post. Do this until the guide is past the lower
post (Fig. 25).
NOTE:
Guide B has a hole near the bottom. This is used in
the next step.
Ensure an equal amount of excess cable remains
on both guides (Fig. 26). Be careful not to pull all the
slack into one guide. If needed you can redistribute
the slack by loosening cables in the middle of the
section and pulling excess in the direction needed.
b. Insert cable guide B into the channel of the second
post ensuring that the excess cable feeds up and
out of the top of the post (Fig. 27). Ensure guide B
is at the bottom of the post and insert bolt through
predrilled hole in the lower stair post. Thread and
tighten nut (Fig. 28).
8
Fig. 27
Fig. 26
Fig. 28
Fig. 24
Fig. 25a
Fig. 25b
Fig. 25c

Publicité

loading