Télécharger Imprimer la page

Eaton DualGuard-S DG-S ESF30 20C6 Instructions D'installation page 11

Publicité

Bild 3 / Fig. 3
Bild 4 / Fig. 4
Bild 5 / Fig. 5
Bild 6 / Fig. 6
2.5 Installation of DualGuard-S 20C6 in fire protection enclosure ELC-ESF30-F
Compact functional unit type DG-S ELC/ELCW-ESF30-F 40071860420 June 2022 www.eaton.com
2.5 Installation of DualGuard-S 20C6 in fire
protection enclosure ELC-ESF30-F
Mount and fasten the fire protection enclosures according
to the separate mounting instructions supplied.
It is imperative to follow the installation instructions of the
manufacturer of the fire protection enclosure.
Then align the DualGuard-S 20C6 unit in front of the fire
protection enclosure and carefully push it into the fire pro-
tection enclosure (Fig.1).
When doing so, do not place any point loads on the front
edge of the base.
Push the DualGuard-S 20C6 unit flush against the rear and
the right wall.
Check directly whether the doors of the units can be
opened.
Mounting the air baffle (Fig. 2) in the roof area.
The self-adhesive foam rubber for sealing may only be
attached to the sheet metal in the system. As soon as
the foam rubber is unrolled the material begins to expand.
Full expansion is reached after 10 minutes to 4 hours,
depending on the temperature.
Mount the baffle and fix it in place (Figs. 3 and 4).
Fit the baffle in the supply air area w (Figs. 5 and 6) as
shown. To do this, push the baffle plate only as far as it
will go into the intermediate space.
In order to compensate for tolerances, the sheet can be
carefully „bent up" (+ 90°) or „compressed" (- 90°).
CAUTION
CAUTION
11

Publicité

loading