Télécharger Imprimer la page

GE Zoneline AZ9VH Serie Instructions D'installation page 26

Publicité

Les langues disponibles

Les langues disponibles

Setting the auxiliary control
Mode E Digital Makeup Air Module Occupancy
occupancy status, press MODE until an E appears in
Mode d Dehumidification
dehumidifying a room during a cooling condition once
the temperature is controlled.
Note: you may see increased power consumption with
the "standard" or "max" settings.
Setting
None
2
3
Mode P Engineering Revision Setup
circuit board is replaced.
is installed, the unit will automatically enter this mode.
P1
engineering revision is the last number in the model
Aux to save and exit.
power cycle using AUX
in the first digit, and follow the steps described above.
UNIT/COMPRESSOR SETUP FOR IEER TESTING
Abbreviated Table
Compressor
RPM
A
B
C
D
Full equation for defining compressor speed rpm:
Example (W + B + GH):
+ pad until the number
MODE until P appears
External Thermostat Connector
Thermostat
Y2
R
Signals
GH
GH
Occupancy
detection OFF
No additional
dehumidification
Nomenclature Example
AZ9VH12DBMH2
IEER Operation Instructions
GH
B
Y
W
C
- Wait for at least 3 minutes.
display.
- Apply thermostat signals as indicated in
the table by connecting the appropriate
nut.
Occupancy
detection ON
Max
dehumidification
Defaults
Makeup Air on: min. of d2
Engineering Revision
MODE and + together.
MODE until E3 appears on the
+ to enter the compressor test
49-5000640 Rev. 1

Publicité

loading