Ending The Drilling Process; Operation And Control - Stand-Guided Drilling; Installing The Drill Rig With Plug Fixing; 6.1.1 Fixing Onto The Wall - Baier Elektrowerkzeuge BDB 829 Traduction De L'original Du Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

EN
5.5

Ending the drilling process

NOTE
To avoid damage to the diamond segments, do not
switch off the dry diamond drill until the rotating di-
amond core drill bit has been almost completely
removed from the masonry.
16
Release the ON / OFF switch (1) to switch
off the dry diamond drill.
Now pull the stopped diamond core bit out of the
drill hole.
Switch off the dust extraction.
Remove drill core
Through-hole:
NOTE
Knocks to the diamond core drill bit with hard
objects can deform or break it
f If the drill core is stuck in the diamond core
drill bit, knock the diamond core drill bit with
a soft piece of wood or plastic to loosen the
drill core.
Non through-hole (blind hole):
NOTE
The diamond core drill bit can be damaged irrepa-
rably if it is jammed in the core drill hole.
Never use the diamond core drill bit to break out
the drill core!
f
17
Use a suitable tool (e.g. BAIER BMH
622 chipping hammer or chisel) to break out
the drill core in the wall.
| 44 |
6
Operation and Control –
Stand-Guided Drilling
6.1
Installing the drill rig with plug
fixing
The drill stand can be fixed onto the floor or wall
using a retaining screw.
18
Use the diamond core drill bit to align the drill
stand with the hole to be drilled:
18
Mark the plug hole for fixing the drill stand
plate (5) through the mounting slot and drill (drill
hole: Ø 15 mm, depth 50 mm).
19
Insert the retaining screw (1) with attached
quick-action plug (2) in the plug hole.
18
Align the drill stand plate (5) with the help of
the spirit level (6) and the four cap nuts (4).
18
Screw in the retaining screw (3) with the
help of the spike (2).
Tighten the quick-action nut (1) with light
18
hammer blows.

6.1.1 Fixing onto the wall

2
If fixing onto the wall, an external spirit level must
be used to adjust the perpendicularity of the drill
stand with the drillhole of the diamond drill core bit.
This adjustment cannot be made using the integrat-
ed spirit level (7) on the drill stand.
6.1.2 Installing the drill stand with
vacuum kit (accessory)
If it is not possible to install the drill stand with the
anchor fixing, the drill stand can be fixed to the floor
using a vacuum kit (order on request). The installa-
tion of the vacuum kit is described in the relevant in-
stallation instructions.

Publicité

Table des Matières
loading

Table des Matières