Connection To The Electric Network - Saeco Idea Rst Cap020/A Mode D'emploi Et D'entretien

Table des Matières
Les langues disponibles

Les langues disponibles

• Connect the filter to the water network.
C
Water Filter
D
Water Net
E
Drain pipe
• Connect a drain pipe to the fitting and fix it with a
serrated clamp.
• Connect the machine to the drinking water network
through the fitting (using tube and fitting made of materials
suitable for food).
H
Drain fitting
I
Dispensing fitting
G
electric power cord
F
supporting feet
• Insert the drain and filling pipes into the proper hole (see
chapter "Unpacking and Positioning").
5.4
Connection to the Electric
Network
The
Technician,
charge of the appliance's
installation, shall make sure
that:
• the power supply system complies with the safety
instructions in force;
• the voltage corresponds to that indicated on the appliance
data plate.
In case of doubt, do not
proceed
installation and ask qualified
and authorised personnel
to accurately check the
system.
Also make sure that the
electrical
appliance is connected to
has the capacity to bear
the max load required, as
indicated on the data plate.
English
Maintenance
who
is
in
with
the
system
the
79
Table des Matières
loading

Ce manuel est également adapté pour:

Idea rst cap020/bIdea rst cap020b 2m

Table des Matières