8.
Using 3x #10x1" Screws, install one (F4) per rail
and aligned with the rail (Figs. 11&12).
9.
Remove clamps from gate.
10.
Repeat steps 2-9 to install the second gate
upright.
6
⁄
⁄
⁄
⁄ " from the back of the gate upright
5
5
5
8
8
Fig. 11
Install F4
Install F4
Install F4
Here
Here
Here
Here
Install F4
Install F4
Here
Here
A A
Panel
Panel
F4
F4
Finished Gate Section
Finished Gate Section
Fig. 12
5/8"
5/8"