Attach The Rail To The Header Bracket - LiftMaster ELITE Serie Manuel Du Propriétaire

Masquer les pouces Voir aussi pour ELITE Serie:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Header Wall
Header
Bracket
Belt Pulley
Bracket
Garage
Door
HARDWARE SHOWN ACTUAL SIZE
Clevis Pin
5/16"x2-3/4"
INSTALLATION STEP 3

Attach the Rail to the Header Bracket

• Position the opener on the garage floor below the
header bracket. Use packing material as a protective
base. NOTE: If the door spring is in the way you'll need
help. Have someone hold the opener securely
on a temporary support to allow the rail to clear
the spring.
• Position the rail bracket against the header bracket.
• Align the bracket holes and join with a clevis pin
as shown.
• Insert a ring fastener to secure.
Header
Bracket
Clevis Pin
5/16"x2-3/4"
10
Ring
Fastener
Belt Pulley
Bracket
Rail
Temporary
Support
Ring Fastener

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Security+ 3850pc

Table des Matières