Ecobee IM-STAT-106-R5 Manuel D'installation page 9

Table des Matières

Publicité

Two Stage Heat/Cool With 1 Stage Auxiliary Heat (Duel Fuel) with 2 Accessories
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
HRV
ACC1r
ACC2
Comp2
ACC2r
ACC3
Humidi er
ACC3r
Two Stage Heat/Cool Two Stage Auxiliary Heat (Duel Fuel) With One Accessory
Chauffage et refroidissement à deux phases et chauffage d'appoint à une phase avec deux accessoires
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
Aux Heat
ACC1r
Stage 2
ACC2
Comp2
ACC2r
ACC3
Humidi er
ACC3r
Chauffage et refroidissement à deux phases et chauffage d'appoint à deux phases avec un accessoire
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
13
Installation Du Thermostat Intelligent
Furnace
Heat Pump
Y
O
W
Y1
G
W2
R
Y2
Hum
R
C
C
Humidi er
24V
C
HRV
24V
C
Furnace
Heat Pump
Y1
O
W1
Y1
W2
G
W2
Y2
R
R
Y2
C
Hum
Humidi er
C
24V
C
Two Stage Furnace (Carrier 58MVB) With Two Stage Heat Pump (Duel Fuel)
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
Aux Heat
ACC1r
Stage 2
ACC2
Comp2
ACC2r
ACC3
Dehumidi er
ACC3r
Appareil de chauffage à deux phases avec déshumidificateur et thermopompe à deux
NOTE
Indicates jumper. Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
factory installed jumper.
Diagram indicates 24V humidi er terminal. If your furnace control board does not have this, you must use a 110V/24V step down transformer.
Equipment Interface
Y
W O/B
G
W2 AUX
R/H
R/C
ACC1
ACC1r
ACC2
ACC2r
ACC3
ACC3r
indique une bretelle. Les accessoires non alimentés nécessitent une bretelle
NOTE
factory installed jumper must be removed for this con guration.
Non Powered Accessories will require a jumper from RH | RC to ACC1, ACC2, ACC3 for a 24V feed.
de RH ou RC à ACC1, ACC2 et ACC3 pour une alimentation de 24 V.
Furnace
Heat Pump
W2
O
Y1
Y1
W/W2
W2
Y/Y2
Y2
G
R
R
C
Dhum
Humidi er
Com
Hum
24V
C
Humidastat
Dual Transformer – Single Stage Cooling With Boiler
Fan Coil
Air Conditioner
Y
24V
G
C
R
C
Boiler
R
C
W
Refroidissement à une phase avec chaudière
Enlevez la bretelle installée en usine
Installation Du Thermostat Intelligent
14

Publicité

Table des Matières
loading

Produits Connexes pour Ecobee IM-STAT-106-R5

Table des Matières