Télécharger Imprimer la page

Vermont Castings DUTCHWEST DW1000L02 Guide Du Propriétaire page 8

Publicité

Les langues disponibles

Les langues disponibles

DW1000/15000/2000
4. Ignite the paper and close door. If fire dies down
substantially, open door slightly.
5. Add larger pieces of wood as the fire progresses be-
ing careful not to overload. Do not fill firebox beyond
firebrick area. An ideal coal bed of 1" to 2" should be
established to achieve optimum performance.
6. This unit is designed to function most effectively
when air is allowed to circulate to all areas of the
firebox. An ideal means of achieving this is to rake a
slight (1" to 2" wide) trough in the center of the coal
bed from front to back prior to loading the fuel.
7. Once fuel has been loaded, close the door and open
air inlet control fully until fire is well established (ap-
prox. 10 minutes) being careful not to overfire.
8. Readjust air inlet control to desired burn rate. If
excessive smoke fills firebox, open air inlet control
slightly until flames resume and wood is sufficiently
ignited. While a basic rule of thumb is "closed-low",
"1/2 way - medium" and "fully open-high", refer to the
Inlet Air Control Settings chart.
9. When refueling, adjust air control to the fully open
position. When fire brightens, slowly and carefully
f i r e - p a r t s . c o m
open the door. This procedure will prevent gases
from igniting causing smoke and flame spillage.
10.Add fuel being careful not to overload.
Desired
inlet
Burn Setting
Air Setting
Low
Closed Fully
Med / Low
1/4 Open
Med / High
3/4 Open
High
Fully Open
*1. Maximum burn times and heat outputs are based on laboratory testing using full loads of sea-
soned hardwoods, and may vary in individual use depending on how the stove is operated, type
and moisture content of fuel, and other factors. Maximum burn times are achieved under different
operating conditions than are maximum heat outputs.
2. These values are based on operation in building code conforming homes under typical winter
climate conditions in the northeastern US. If your home is of nonstandard construction (i.e. unusu-
ally well-insulated, built underground, or if you live in a more temperate climate), these may not
apply. Since so many variables affect performance, consult your Dutchwest Authorized Dealer to
determine realistic expectations for your home.
3. Under specific conditions used during EPA emission testing.
Glass Care
The following use and safety tips should be observed.
1. Inspect the glass regularly for cracks and breaks. If
you detect a crack or break, extinguish the fire im-
mediately and contact your dealer for replacement.
2. Do not slam door or otherwise impact the glass.
When closing doors, make sure that logs or other
objects do not protrude and impact the glass.
3. Do not clean the glass with materials which may
scratch (or otherwise damage) the glass. Scratches
on the glass can develop into cracks or breaks.
8
inlet Air Control Settings
*Approx. BtU output
DW1000 Series
DW1500 Series DW2000 Series
10,600
10,370
12,118
12,420
19,413
15,676
26,100
29,301
4. Never attempt to clean the glass while unit is hot. If
the deposit is not very heavy, normal glass clean-
ers are adequate with a plain, nonabrasive scouring
pad. Heavier deposits may be removed with the use
of a readily available oven cleaner.
5. Never put substances which can ignite explosively
in the unit since even small explosions in confined
areas can blow out the glass.
6. This unit has an airwash system, designed to reduce
deposits on glass.
Replace glass only with high temperature Robax
Pyroceram of the proper size and thickness.
Gasket Replacement
After extensive use, the sealing material which provides
glass and door seal may need to be replaced if it fails
to sustain its resilience. Inspect glass and door seal pe-
riodically to ensure for proper seal. If gaskets become
frayed or worn, replace immediately.
Contact your dealer for approved replacement parts.
The following steps should be followed for glass gasket
replacement:
1. Ensure appliance is not in operation and has thor-
oughly cooled.
2. Remove screw and glass clip.
3. Lift glass out from glass clip.
4. Remove old gasket and clean
12,000
13,400
glass.
17,700
5. Replace new gasket starting at the
55,100
bottom of glass working along edges,
being sure to center gasket channel
on glass.
6. Trim to length and butt ends to-
gether.
7. Replace glass in door, being sure
not to over-tighten screw and clip.
The following steps should be fol-
lowed for door gasket replacement:
1. Ensure appliance is not in operation and has thor-
oughly cooled.
2. Remove old door gasket and clean channel.
3. Using an approved high temperature gasket cement,
apply a thin coat in bottom of channel.
4. Starting at hinge side of door, work into around door
unit, and butt and trim to length.
5. Close door and allow three to four hours for cement
to set before restarting appliance.
30004580

Publicité

loading

Ce manuel est également adapté pour:

Dutchwest dw1500l02Dutchwest dw2000l02