DW1000/15000/2000
installation
Contact your local buildng inspector prior to installa-
tion. A permit may be required in your area.
This Homeowner's Manual describes the instal-
lation and operation of the models: DW1000L02,
DW1500L02, DW2000L02 non-catalytic wood heater.
This heater meets US Environmental Protection Agen-
cy's emission limts for wood heaters. Under specific
conditions this heater has been shown to deliver heat at
the rates shown in Chart
Heat output Ranges
Model
DW1000L02
DW1500L02
DW2000L02
BACK WALL
f i r e - p a r t s . c o m
B
E
A
D
8"
* CANADA **U.S.A
DW1000 Series Clearances to Combustibles
A
B
Single wall
12"
12Z\x"
Connector
(305) (318) (178) (405) (381) (381) (1422)
Double wall
8Z\x"
8"
Connector
(216) (203) (140) (394) (254) (330) (1422)
DW2000 Series Clearances to Combustibles
A
B
Single wall
15"
10"
Connector
(381) (254) (229) (822) (325) (495) (1372)
Double wall
14"
10"
Connector
(356) (254) (203) (584) (325) (457) (1372)
4
output Range BtU/hr
10,600 to 26,100
10,370 to 29,301
12,000 to 55,100
8"(203 mm)
C
**16" (406 mm)
*18" (457 mm)
8"
ST1032
Figure 2
Clearance to Combustible Materials
C
D
E
F
7"
19Z\x"
15"
15"
5Z\x"
15Z\x"
10"
13"
C
D
E
F
9"
24Z\x"
13"
19Z\x"
8"
23"
13"
18"
1. Remove all parts from inside the stove body.
2. Select the proper location for the stove. These ap-
pliances must not be installed any closer than the
minimum clearance to combustible materials. (Fig.
2) The stove must be installed on a noncombustible
surface as shown on Page 7, Figure 4.
3. If noncombustible materials have been installed on
the walls, obtain the minimum clearances from either
the manufacturer of these materials or the local
building inspector's office.
4. Install the refractory bricks. (Fig. 3)
5. Install the stovepipe INSIDE the flue collar on the top
of the stove between the stove and chimney.
6. Do Not use a grate to elevate the fire.
failure to follow the minimum clearance requirements
and noncombustible surface requirements may result
in an unsafe installation.
BACK WALL
C
F
F
DW1500 Series Clearances to Combustibles
A
G
Single wall
11Z\x"
56"
Connector
(292) (229) (178) (533) (292) (457) (1384)
Double wall
6"
56"
Connector
(152) (152) (102) (381) (203) (356) (1384)
Unit must be placed on a noncombustible floor protection
G
equivalent to 3/8" millboard. Floor protector must have min. R
54"
value of .893. Consult your local building authorities for further
information.
54"
Ceiling
G
ST1033
Floor
B
C
D
E
9"
7"
21"
11Z\x"
18"
6"
4"
15"
8"
14"
F
G
54Z\x"
54Z\x"
30004580

Publicité

loading

Ce manuel est également adapté pour:

Dutchwest dw1500l02Dutchwest dw2000l02