Télécharger Imprimer la page

Eaton Crouse-Hinds FMVA Informations D'installation Et D'entretien page 3

Publicité

Les langues disponibles

Les langues disponibles

DIMENSIONS
VISOR INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align visor with four (4) screw holes at the top of the fixture shown in
Figure 9.
4.
Install screws provided with visor, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Visor can be installed before or after floodlight has been in operation.
All statements, technical information and recommendations contained herein are based on information and tests we believe to be reliable. The accuracy or completeness thereof are not guaranteed. In accordance with Crouse-
Hinds "Terms and Conditions of Sale," and since conditions of use are outside our control, the purchaser should determine the suitability of the product for his intended use and assumes all risk and liability whatsoever in
connection therewith.
With Visor and Guard
Figure 7
With Visor Only
Figure 9
Figure 6
GUARD INSTALLATION INSTRUCTIONS
1.
Remove power from floodlight.
2.
Place floodlight face up.
3.
Carefully align guard with four (4) screw holes on each side of the fixture shown
in the image above.
4.
Install screws provided with guard, taking care to not scratch the finish of the
floodlight. Torque to 19 in.-lbs. (2.2 N-m).
5.
Install floodlight per above instructions.
NOTE: Guard can be installed before or after floodlight has been in operation.
Eaton's Crouse-Hinds Division
1201 Wolf Street, Syracuse, New York 13208 • U.S.A.
Copyright
2019
©
With Guard Only
Figure 8
IF 1883
Revision 1
New 08/19

Publicité

loading