Télécharger Imprimer la page

Best PIK33 Guide D'installation page 9

Publicité

Les langues disponibles

Les langues disponibles

13. CONNECT WIRING (ALL BLOWERS)
Risk of electrical shock. Electrical wiring must be done by qualified personnel in accordance with all
applicable codes and standards. Before connecting wires, switch power off at service panel and lock
service disconnecting means to prevent power from being switched on accidentally.
Position insert below the installed custom hood. Pull cable through hole in top of insert.
INTERIOR BLOWER: Remove the cable knock-out on the top of the rough-in plate. Remove rough-in plate wiring cover. Place
the wire clamp in the knock-out hole, insert the cable through the wire clamp in the rough-in plate wiring box. Tighten the wire
clamp to secure the cable.
Connect cable into wiring box using provided wire connectors.
Connect wires as follow: BLACK to BLACK, WHITE to WHITE and GREEN or
BARE wire under ground screw. DO NOT FORGET TO CONNECT THE
GROUND. Reinstall wiring cover.
IN-LINE OR EXTERIOR BLOWER : Remove rough-in plate wiring cover and connect wiring (see instructions included with
in-line or exterior blower).
14. INSTALL THE ROUGH-IN PLATE (ALL BLOWERS)
INTERIOR BLOWER:
Carefully install the rough-in plate inside
the top of the insert with four (4) lock nuts.
See picture beside.
IN-LINE OR EXTERIOR BLOWER :
15. INSTALL THE TRANSITION (INTERIOR BLOWER)
Slide the transition over the adapter/damper. Seal the transition to the adapter/damper
by using duct tape.
!
WARNING
Refer to instructions included with ILB3, ILB6, ILB9, ILB11, EB6, EB9, EB12 or EB15
rough-in kit. Secure the rough-in plate inside the top of the insert with (4) lock nuts.
- 9 -
HD0007
1) Ground screw
HD0042
HD0091
1

Publicité

loading

Ce manuel est également adapté pour:

Pik45