Mains Plug Connection; Welding Connections; Grounding Pliers Connections; Gas Connections - Magmaweld RS 200 MK Mode D'emploi

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

RS 200 MK - RS 250 MK - RS 300 MK - RS 350 MK - RS 400 MK

2.3 Mains Plug Connection

For your safety, never use the mains cord of the machine without a plug.
• No plug has been connected to the mains cable since there may different types of outlets available in plants,
construction sites and workshops. A suitable plug must be connected by a qualified technican. Make sure that
the grounding cable marked with
• After connecting the plug to the cable, do not attach it to the outlet at this stage.

2.4 Welding Connections

• Grounding cable sockets with different inductance values

2.4.1 Grounding Pliers Connections

allow welding with lower spatter in a wide current range.
Socket for low current and small wire diameters
for high current and large wire diameters
socket should be preferred.
• Connect the grounding pliers wire to one of the grounding wire
sockets on the machine and tighten by turning it to the right.
• To improve the welding quality, firmly connect the grounding
pliers to the workpiece as close as possible to the welding area.
• If you will use the gas cylinder on the gas cylinder transport platform on the machine, place the gas cylinder

2.4.2 Gas Connections

here and secure it with a chain.
• If you will not place the gas cylinder on the machine, secure the gas cylinder to the wall with a chain.
• Use safety regulators and heaters according to the standards for work safely to achieve the best results.
• Make sure the size of the hose connection of the gas regulator you are using is 3/8" (9.5mm).
• Open the gas cylinder valve keeping your head and face away from the outlet of the valve and keep it open for
5 seconds. By this means, possible sediment and impurities will be discharged.
1
2
Figure 3 : Gas Cylinder - Heater - Regulator Connections
www.magmaweld.com
and a yellow / green color is present.
1- Gas Cylinder Valve
2- Gas Cylinder
3- CO2 Heater
3
4- Chain
5- CO2 Heater Energy Cable 10- Gas Hose
6
7
8
9
10
4
5
USER MANUAL | MANUEL D'UTILISATION | РУКОВОДСТВО ПО ЭКСПЛУАТАЦИИ | KULLANIM KILAVUZU
socket,
or
Figure 2 : Grounding Pliers Connections
Installation
6- Gas Regulator
7- Manometer
8- Flowmeter
9- Flow Adjustment Valve
17
EN

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Rs 250 mkRs 300 mkRs 350 mkRs 400 mk

Table des Matières