Vent Terminal Installation Procedure
1) Determine the vent terminal installation location
and make a 160mm (6.3") diameter hole.
Install the sleeve into the hole with the
triangular mark ( ) pointing up. Use the
wall anchors and rounded wood screws.
142mm (5.6")
174mm (6.85")
Rounded wood screw (short)
Rounded wood
screw (long)
2) Attach the wall flange to the sleeve.
Wall flange
Tapping screw
* The proper flange orientation
depends on the desired
orientation of the vent terminal.
* Unless the vent terminal is
installed as in option (1) in the
chart to the right, the outlet will
need to be adjusted in order to
ensure it is oriented in the proper
direction.
Triangular mark (
)
Screw holes (4)
(7.2mm (0.3") diameter and
35mm (1.4") to 40mm (1.6") depth).
Wall anchor
Sleeve
Waterproof the clearance with
a high temperature sealant.
Terminal Orientation
(1)
Sleeve
(2)
(3)
(4)
Before installing the sleeve, adjust its length to fit the
wall thickness.
(The length can be adjusted in increments of 10mm (0.4".)
Remove this screw
and slide out the
external cylinder.
Waterproof the clearance between the sleeve
and wall hole with a high temperature sealant.
160mm (6.3") dia.
Flange Orientation
174mm (6.9")
Up
Intake
Exhaust
Down
Up
Exhaust
Intake
Down
Up
Exhaust
Intake
Down
Up
Intake
The terminal cannot be installed in this
orientation.
Exhaust
Down
* When drilling, take care not to damage electric
wiring, or gas or water piping in walls.
Slide out the external cylinder
until it is flush with the external
wall and replace screw.
Sleeve
Waterproof the
clearance with a high
temperature sealant.
Outlet Orientation
Top
Bottom
174mm (6.9")
Incorrect
Incorrect
210mm (8.3")
Correct
Correct