ZUCCHETTI Lizard M Serie Manuel D'utilisation page 72

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 123
EQUIPMENT INSTALLATION PLANNING
Robot installation does not involve inter-
ventions that are difficult to carry out,
but requires a minimum of preliminary
planning to define the best area to install
Power
supplier-transmitter
group and recharging station in-
stallation area
– Power
supplier-transmitter
group and recharging station
must be installed inside the
main work area and near to
GB
each other.
– The recharging station must be
positioned on a flat and stable
surface and able to guarantee
good drainage to avoid flooding.
– The section of input wire must
be rectilinear and aligned per-
pendicularly to the recharging
station for at least 2 m and the
output section must be located
at least 30 cm from the re-
charging station; this makes it
possible for the robot to enter
correctly.
the charging station, power supply-trans-
mitter group and to lay out the perime-
ter wire.
power supply-transmitter unit
power supply-
transmitter unit
perimeter wire
Reload station
wire laying direction
power supply-transmitter unit
power supply-transmitter unit
- 12 -
perimeter
wire
IDM - 41501700500.tif
IDM - 41501700500.tif
IDM - 41501700600.tif
IDM - 41500902400.tif
User's manual

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Lizard m4Lizard m440Lizard m480

Table des Matières