Connecting Pipes; Preparation Of Piping - LG ABUQ22GM1A4 Manuel D'installation

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

CONNECTING PIPES

Preparation of Piping

Main cause of gas leakage is defect in flaring work. Carry out correct flaring work in the following
procedure.
C C ut the pipes and the cable
- Use the piping kit accessory or the pipes pur-
chased locally.
- Measure the distance between the indoor
and the outdoor unit.
- Cut the pipes a little longer than measured
distance.
- Cut the cable 1.5 m longer than the pipe
length.
Burrs removal
- Completely remove all burrs from the cut
cross section of pipe/tube.
- Put the end of the copper tube/pipe in a
downward direction as you remove burrs in
order to avoid dropping burrs into the tubing.
Putting nut on
- Remove flare nuts attached to indoor and
outdoor unit, then put them on pipe/tube
having completed burr removal.
(not possible to put them on after flaring
work)
Flaring work
- Carry out flaring work using flaring tool as
shown below.
Outside diameter
mm
inch
Ø 6.35
Ø 9.52
Ø 12.7
Ø 15.88
Ø 19.05
Firmly hold copper pipe in a bar in the
dimension shown in the table below.
Check
- Compare the flared work with figure below.
- If flare is noted to be defective, cut off the
flared section and do flaring work again.
A
mm
1/4
1.1~1.3
3/8
1.5~1.7
1/2
1.6~1.8
5/8
1.6~1.8
3/4
1.9~2.1
CONNECTING PIPES
Copper
Slanted Uneven Rough
tube
90
Pipe
Point down
Flare nut
Copper tube
Bar
Bar
"A"
Copper pipe
Clamp handle
Smooth all round
Inside is shining without scratches.
= Improper flaring =
Inclined
Surface
damaged
Even length
all round
13
Reamer
Handle
Yoke
Cone
Red arrow mark
Cracked Uneven
thickness

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Atuq22gpla4

Table des Matières