Installation; Points To Be Considered When Re-Transporting Your Refrigerator; Before Operating Your Refrigerator; Electric Connection - Beko CN 152220 T Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 26
3

Installation

B
Please remember that the
manufacturer shall not be held liable if
the information given in the instruction
manual is not observed.
Points to be considered
when re-transporting your
refrigerator
1.Your refrigerator must be emptied and
cleaned prior to any transportation.
2.Shelves, accessories, crisper and etc.
in your refrigerator must be fastened
securely by adhesive tape against any
jolt before repackaging.
3.Packaging must be tied with thick
tapes and strong ropes and the
rules of transportation printed on the
package must be followed.
Please do not forget...
Every recycled material is an
indispensable source for the nature
and for our national resources.
If you wish to contribute to recycling
the packaging materials, you can
get further information from the
environmental bodies or local
authorities.
Before operating your
refrigerator
Before starting to use your refrigerator
check the following:
1.Is the interior of the refrigerator dry and
can the air circulate freely in the rear
of it?
2.Please install the 2 plastic wedges as
illustrated in the figure. Plastic wedges
will provide the required distance
between your refrigerator and the wall
in order to allow the air circulation.
(The illustrated figure is only an
example and does not match exactly
with your product.)
3.Clean the interior of the refrigerator as
recommended in the "Maintenance
and cleaning" section.
4.You will hear a noise as the compressor
starts up. The liquid and gases sealed
within the refrigeration system may
also give rise to noise, even if the
compressor is not running and this is
quite normal.
5.Front edges of the refrigerator may feel
warm. This is normal. These areas
are designed to be warm to avoid
condensation

Electric connection

Connect your product to a grounded
socket which is being protected by a
fuse with the appropriate capacity.
8
EN

Publicité

Table des Matières
loading

Table des Matières