Télécharger Imprimer la page

Fronius Galvo 208 Instructions D'installation page 6

Masquer les pouces Voir aussi pour Galvo 208:

Publicité

Les langues disponibles

Les langues disponibles

NOTE! Form a min. 4 in. wire loop using all wires..
NOTE! To ground solar module frames or mounts, you must observe both the relevant instructions from
the solar module manufacturer and national guidelines.
NOTE! Follow general ESD guidelines when handling option cards.
NOTE! Fronius will not bear any costs for loss of production, or installations, etc., which may arise due
to a detected electric arc and its consequences. Fronius accepts no liability for fires which may break
out despite integrated arc detection/interruption (e.g., due to a parallel arc).
NOTE! Before an inverter can be reset following a detected electric arc, check the entire affected pho-
tovoltaic system for any damage.
Fronius Manufac-
Detailed warranty terms and conditions specific to your country can be found online:
turer's Warranty
www.fronius.com/solar/warranty
To take advantage of the full warranty duration for your newly installed Fronius inverter or
accumulator, register your product at: www.solarweb.com.
CAUTION! Risk of damage to inverters and other live photovoltaic system components due to poor or
unprofessional installation.
Poor or unprofessional installation can cause overheating of cables and terminal connections and result
in arcs. These can cause heat damage, which in turn may lead to fires.
Observe the following when connecting AC and DC cables:
-
Tighten all terminals to the torque specified in the operating instructions
-
Tighten all grounding terminals (PE / GND), including unused
ones, to the torque specified in the operating instructions
-
Do not overload cables
-
Check cables for damage and verify that they are laid correctly
-
Take note of the safety instructions, operating instructions and
any local connection regulations
Using fastening screws, always screw the inverter firmly to the wall
bracket to the torque specified in the operating instructions.
Ensure that the fastening screws are tight before starting the inver-
ter!
Manufacturer's instructions regarding connection, installation and operation must always be observed. To re-
duce the hazard potential to a minimum, perform all installation and connection work carefully according to the
instructions and regulations.
Refer to the device operating instructions / installation instructions for the tightening torques to be used at the
relevant terminal connections.
6
2
2.5 Nm

Publicité

loading

Ce manuel est également adapté pour:

Galvo 240Galvo 220Galvo 208nGalvo 220nGalvo 240n