Interruption Of Work; Cleaning Unit (Shutting Down Operation) - WAGNER Super Finish 21 Mode D'emploi

Masquer les pouces Voir aussi pour Super Finish 21:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

Interruption of work/ Cleaning unit
7.

InterruptIOn Of wOrk

1.
Open the relief valve, valve position
2.
Switch off the unit.
3.
Pull trigger guard of spray gun to decrease the pressure
of the highpressure hose and the spray gun.
4.
Secure spray gun, see operating manual for spray gun.
5.
If the tip is to be cleaned, see page 46, point 13.2.
6. unit with suction system
Leave the suction system submerged in the coating
material or submerge it into the appropriate cleaning agent.
Suction filter and unit should not dry out.
In using quick-drying - or two-component
coating material, do not fail to rinse unit
through with a suitable cleaning agent during
Attention
the processing period.
8.
cleAnInG unIt (SHuttInG
dOwn OperAtIOn)
Cleanliness is the surest guarantee for disturbance-free opera-
tion. Always clean the unit after completing spraying work. In
no event may residue of the coating material dry and collect
in the unit. The cleaning agent used for cleaning (only with
a flash point of over 21 °C) must correspond to the coating
material.
Secure spray gun
, see operating manual for spray gun.
Dismount tip and clean, see page 46, point 13.2.
unit with suction system (fig. 14)
1.
Remove suction system from the material vessel, e.g. put
unit in the horizontal set-up position.
2.
Switch on the unit.
3.
Turn pressure regulating knob to the
4.
Close the relief valve, valve position
5.
Pull the trigger guard on the spray gun in order to pump
residue coating material from the suction pipe, the high-
pressure hose and the spray gun into an open container.
In case of coating material containing solvents,
the vessel must be earthed.
Attention
caution! do not pump or spray in container
with a small opening (bunghole)!
See safety regulations.
Danger
6.
Submerge suction system in a suitable cleaning agent.
7.
Open the relief valve, valve position
8.
Switch off the unit.
9.
Screw on spray gun on suction pipe (fig. 14) with the two
accompanying spanners 22 mm.
10.
Switch on the unit.
11.
Pump suitable cleaning agent in the circuit for approx. 1
minute.
12.
Pull trigger guard on spray gun and hold with clamp.
34
All manuals and user guides at all-guides.com
GB
13.
14.
15.
(circulation).
16.
17.
18.
Achtung
Achtung
right.
(spraying).
unit with upper hopper
1.
2.
3.
4.
Attention
(circulation).
5.
6.
7.
Close the relief valve, valve position
Clean suction pipe for about three minutes.
Rinse in circuit – open the relief valve, valve position
(circulation).
Close spray gun.
When cleaning with water, repeat procedure for about three
minutes with clear water.
Switch off unit.
the effect of cleaning is increased if the
spray gun is alternately opened and closed.
In case of coating materials diluted with
water, warm water improves cleaning.
Switch on the unit.
Turn pressure regulatin knob to the
Close the relief valve, valve position
Pull the trigger guard on the spray gun in order to pump
residue coating material from the upper hopper, the high-
pressure hose and the spray gun into an open container.
In the case of coating materials containing sol-
vents, the container must be earthed.
caution! do not pump or spray in container
with a small opening (bunghole)!
See safety regulations.
Danger
Fill upper hopper with suitable cleaning agent.
Open the relief valve, valve position
Pump suitable cleaning agent in the circuit for several
(spraying).
right.
(spraying).
(circulation).
Super Finish 21 • 23

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Super finish 23

Table des Matières