GOK BC-1 Serie Notice De Montage Et De Service page 29

Masquer les pouces Voir aussi pour BC-1 Serie:
Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 41
Calculation option for the adjusting dimension X
a = dimension a= H - L
b = tank wall thickness
1. Maximum volumetric flow rate of the booster pump of the road tanker
2. Switching and closing delays of the booster pump of the road tanker
Level sensor according to measurement / datasheet
Switch / relay / or similar
Booster pump, flow time
Shut-off fitting:
• mechanical, manually operated time alarm to closing start, closing time:
• electrically, pneumatically, or hydraulically operated, closing time:
1)
t
+ t
= 3s
1
2
3. Overrun volumeV
Overrun volume from delays:
V
= Q
• (t
/ 60)
1
max
ges
Overrun volume from filler line:
V
= (π / 4) • D
² • L
2
i
D
= internal pipe diameter in mm
i
L
= length of the filler line in m
FL
V
= V
+ V
4
1
2
4. Level L
1
Volume at admissible level
Overrun volume
Volume at level L
1
Then, the volume at level V
calculation, in the level L
The adjusting dimension X must be determined taking into account* the tank shape:
Installation on tank ceiling:
* if applicable Take into account ADJUSTING DIMENSION X AND SUBSEQUENT LEAK
PROTECTION LINING .
part no. 15 700 51 g
- b
1
Total time (t
= 3s + t
ges
4
/ 1000
FL
V
= V
- V
5
3
4
value results, in combination with the calibration chart or by
5
.
1
X = H - L
Overfill prevention device type BC-1
H = height or diameter of the tank
k
= height bushing or threaded flange
+ t
):
3
4
- b
1
Q
l/min
max
Time
1)
t
s
1
1)
t
s
2
t
s
3
s
t
4
s
t
s
ges
V
1
L
V
L
2
V
L
4
V
L
3
V
L
4
V
L
5
=
mm
9 / 20

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Bc-1-4Bc-1-2

Table des Matières