Meec tools 015275 Mode D'emploi page 34

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 57
EN
IMPORTANT:
The outlet tube must withstand the
maximum pressure of the product. Use a
1/2" outlet tube with a suitable screw
coupling.
The product has an optimal pump
capacity at a lifting height of up to
1 metre. Leaks on the pressure side can
result in interference and malfunction.
A pressure tank or similar pressure
equalisation buffer should therefore be
installed on the pump outlet, to reduce
the number of times the pump starts.
To simplify emptying the system a
shut-off valve should be installed
between the product and the outlet
tube, to prevent the water in the
pressure tube running out.
4.
Pour water into the refill opening on the
product until it runs over.
To fill the pump with water (vent)
open the refill plug and pour water in
until the inlet tube and pump housing
are full of water. If despite filling the
level of water does not reach the refill
opening then the non-return valve is
probably defective and must be
replaced. Open all the taps, valves etc.
when filling with water so that the air
in the tubes can flow out.
NOTE:
Do not run the product without water other
than temporarily – dry running reduces the
life span. Damage resulting from running dry
is not covered by the warranty.
5.
Replace the cap over the refill opening
when the pump housing is full of water
and firmly tighten.
6.
Plug the plug into an earthed power
point.
7.
Make sure that all the valves in the intake
and pressure tube are open –the pump
must not run with closed valves.
8.
Start the product with the power switch.
Switch off the product after use with the
power switch.
34

Publicité

Table des Matières
loading

Table des Matières