Emerson MIDWAY ECO LED Mode D'emploi page 8

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

3. Ceiling Fan Assembly
3.9
Reinstall the hanger ball (Figure 9) on the downrod as
follows:
Route the two 80" motor leads through the hanger ball and
slide the hanger ball over the downrod.
Position the pin through the two holes in the downrod and
align the hanger ball so the pin is captured in the groove in
the top of the hanger ball.
Pull the hanger ball up tight against the pin and securely
tighten the set screw in the hanger ball. A loose set screw
could create fan wobble.
WARNING
!
It is critical that the pin in the hanger ball is properly
installed and the set screw securely tightened. Failure to
verify that the pin and set screw are properly installed
could result in the fan falling.
3.10
The fan comes with black and white leads that are
80" long.
Measure up approximately 6 to 9-inches above top of
hanger ball / downrod assembly (Figure 10).
Cut off excess leads and strip back insulation 1/2-inch from
end of leads.
Carefully turn the partially assembled ceiling fan upside
down and place onto the foam pad in preparation for
mounting the fan blades and light fixture.
(Continued)
PIN
HANGER
BALL
Figure 9
1/2-INCH
6 TO 9
INCHES
Figure 10
8
SET SCREW
DOWNROD
CEILING
COVER
BLACK WIRE
WHITE WIRE
HANGER BALL
HANGER BALL/
DOWNROD
ASSEMBLY
DOWNROD
ETL Model No.: CF955L

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Cf955lbs00Cf955lorb00Cf955lww00

Table des Matières