Commissioning; Before Commissioning; Before Operation - Wetrok Discomatic Samba XT Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

  • FRANÇAIS, page 13
5

COMMISSIONING

5.1

Before commissioning

Before commissioning / Initial commissioning
Delivery, or instructions on safety regulations, handling and maintenance, in addition to initial commissioning, are normally undertaken
by an approved expert. If this is not the case, the operating company is responsible for instructing the operator.
Items of jewellery, such as rings and chains, must be removed.

Before operation

1
Connect battery cables.
LED indicator at charger while charging
Fully charged.
Loading almost completed (approx. 20 min.).
LED indicator at operating lever while using
Fully charged.
Remaining battery capacity at approx. 30 %.
Is illuminated
Flashes
2
Recharge battery (approx. 6 hrs.).
The battery is fully charged,
when the green light is on.
Battery is loading.
Battery almost low, recharge immediately.
Battery low, machine is
switched OFF.
36

Publicité

Table des Matières
loading

Table des Matières