Putting Into Operation; Electric Shock - Binzel Abicor iROB Pulse 400 Mode D'emploi

Table des Matières

Publicité

Les langues disponibles
  • FR

Les langues disponibles

iROB Pulse

6 Putting into operation

Risk of injury due to unexpected start-up
The following instructions must be adhered to for the entire duration of maintenance, servicing, mounting,
dismounting and repair work:
• Switch off the power source.
• Close the gas supply.
• Close off the compressed air supply.
• Disconnect all electrical connections.
• Switch off the entire welding system.
Risk of injury
Increased noise pollution.
• Wear your personal protective equipment: ear protection.

Electric shock

Dangerous voltage due to defective cables.
• Check all live cables and connections for proper installation and damage.
• Replace any damaged, deformed or worn parts.
Risk of injury
Limbs can be crushed and cut.
• Use an appropriate lifting tool with load securing devices for transport and installation.
NOTICE
• Please take note of the following instructions:
• The system may only be installed and put into operation by authorized personnel
• Components must only be used in environments with sufficient ventilation.
• The interconnection (serial or parallel connection) of several power sources may result in material
BAL.0323.0 • 2017-08-31
DANGER
CAUTION
WARNING
WARNING
 3 Product description on page EN-6
(in Germany see TRBS 1203).
damage.
6 Putting into operation
EN - 13

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Irob pulse 400 mvIrob pulse 500

Table des Matières