Installation; Install The Conduit - CAME FE4024 Instructions D'installation

Masquer les pouces Voir aussi pour FE4024:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

INSTALLATION

INSTALL THE CONDUIT

Check the national and local building codes before installation. The instructions and
illustrations in this manual are examples ONLY. Your installation may vary depending
on space, obstructions, and accessories. It is up to the installer to select the most
suitable solution.
1
Determine the location for the operator and any accessories (Figure 1).
2
Prepare a trench and install the junction box and electrical conduits
(Figure 2).
NOTE: ALL power and control wiring MUST be run in separate conduit. The
number of conduits will depend on your site and the accessories to be
installed.
• To AVOID damaging gas, power or other underground utility lines, contact
underground utility locating companies BEFORE digging more than 18 inches
(46 cm) deep.
Figure 1
Photoelectric Sensors
Key-switch Selector
Antenna
Flashing Light
Control
Panel
Mechanical Stop
Junction Pit
Figure 2
10
INSTALL THE CONDUIT
Junction Box
Mechanical Stop
Electric Lock
Operator
Photoelectric
Sensors

Publicité

Chapitres

Table des Matières
loading

Ce manuel est également adapté pour:

Fe4024v

Table des Matières