Assembly; Delivery Content; Preparatory Activities; Workplace Requirements - HOLZMANN MASCHINEN D 510F Manuel D'utilisation

Masquer les pouces Voir aussi pour D 510F:
Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

14

ASSEMBLY

14.1 Delivery content

Please check the product contents immediately after receipt for any eventual transport damage or
missing parts. Claims from transport damage or missing parts must be placed immediately after
initial machine receipt and unpacking before putting the machine into operation. Please
understand that later claims cannot be accepted anymore.

14.2 Preparatory activities

14.2.1 Workplace requirements

The workplace has to fulfill the requirements.
The ground has to be even, in level and hard. It must be suitable at least to weight it with double
weight per square meter than the machines net weight.
The chosen workplace must have access to a suitable electric supply net hat complies with the
machines requirements.

14.2.2 Preparation of the surface

Uncoated metal machine parts have been insulated with a greasy layer to inhibit corrosion.
This layer has to be removed. You can use standard solvents that do not damage the machine
surface.
Do not use solvents based on nitrite, aggressive solvents like break
cleaners or scrubbing agents!
These damage the machine surface.
14.3 Assembly
The machine is delivered pre-assembled.
For transport reasons some parts of the machine can be assembled by the customer.

14.3.1 Faceplate

Place the fork wrench (2) behind the face plate (1). Fix the drive
shaft to the fixation rod (3) and solve or fix the faceplate with the
spanner.
W A R N I N G
Check before each use of the machine the tightness of the
face
plate!

14.3.2 Insert 4-zag driver

Driving in the 4-zag carrier (9) in the hole in the spindle
taper with momentum until it is firmly seated.
HOLZMANN MASCHINEN GmbH
www.holzmann-maschinen.at
N O T I C E
ASSEMBLY
Spindle
9
25
D 510F

Publicité

Table des Matières

Dépannage

loading

Table des Matières