WIKA SB15 Mode D'emploi page 15

Table des Matières

Publicité

Les langues disponibles

Les langues disponibles

5. Commissioning, operation
Connection via protection cap
1. Loosen knurled nuts of the two lateral threaded bolts. After that, dismount the clamping
bracket from the threaded bolts.
2. Remove protection cap.
3. Pass the connection cable through the cable gland.
Make sure that the clamp of the cable gland has contact with the cable.
WIKA operating instructions models SB15, SW15
EN
15

Publicité

Table des Matières
loading

Ce manuel est également adapté pour:

Sw15

Table des Matières